Tunnel Engineering Construction Schedule Analysis and Management Based on Visual Simulation

Tunnel Engineering Construction Schedule Analysis and Management Based on Visual Simulation
下载PDF
导出
摘要 The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the construction simulation and the resource optimization of tunnel engineering are made. A risk analysis and a decision-making method of tunnel engineering construction schedule based on visual simulation are presented. Furthermore, using S curve theory and schedule management method, the real-time management and control method of tunnel engineering construction based on visual simulation is presented. The application to the tunnel engineering construction schedule analysis and management shows the feasibility and effectiveness of the method presented in this paper. The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the construction simulation and the resource optimization of tunnel engineering are made. A risk analysis and a decision-making method of tunnel engineering construction schedule based on visual simulation are presented. Furthermore, using S curve theory and schedule management method, the real-time management and control method of tunnel engineering construction based on visual simulation is presented. The application to the tunnel engineering construction schedule analysis and management shows the feasibility and effectiveness of the method presented in this paper.
作者 宋洋 钟炜
出处 《Transactions of Tianjin University》 EI CAS 2007年第2期131-136,共6页 天津大学学报(英文版)
基金 Supported by National Natural Science Foundation of China (No.50539120) Natural Fund for Distinguished Young Scholars of China(No.50525927)
关键词 隧道工程 建设进度分析 进度管理 可视化模拟 资源优化 风险分析 visual simulation resource optimization risk analysis real time management S curve
  • 相关文献

参考文献7

  • 1Chen Yanshun.Construction Organization and ScheduleControl of Building Project[]..2003
  • 2Yang Xuehong,Hu Zhigen.Petri network-based system modeling of tunnel construction[].Water and Electricity EnergySource Science.2001
  • 3Barraza G A,Back W E.Probabilistic monitoring of project performance using SS-curves[].Journal ofCon- struction Engineering and ManagementASCE.2000
  • 4Barraza G A,Back W E.Probabilistic forecasting of project performance usingstochastic S curves[].Journal of Construction Engineering and ManagementASCE.2004
  • 5Zhang Hong,TamC M,Li Heng.Activity object-oriented simulationstrategyfor modelingconstructionoperations[].Journal ofComputingin Civil EngineeringASCE.2005
  • 6Zhong Denghua,ZhengJiaxiang,Liu Donghaiet al.Visu- al Simulation Technique andIts Application[]..2002
  • 7Kamat VR,Martinez J C.Visualizing simulated construc- tion operations in 3D[].Journal of Computingin Civil Engineering.2001