期刊文献+

潜流人工湿地除氮机理的研究进展 被引量:15

Progress on the nitrogen removal mechanism in surface flow constructed wetland
下载PDF
导出
摘要 介绍了湿地的概念及人工湿地的发展现状,阐述了人工湿地除氮的机理,提出了国内外提高污水中氮去除率的研究方法。提高人工湿地硝化能力,就可以提高湿地中氮去除率。调整湿地内部的结构,改善湿地内部的微环境,是提高人工湿地硝化能力的主要途径。 The concept and the present development of the constructed wetland were introdured. The mechanism of nitrogen removal in the constructed wetland was explained and the research methods of increasing nitrogen removal rate in our country and abroad were discussed, The nitrogen removal rate would be increased through enhancing the nitrification ability in constructed wetland. The main ways to enhance nitrification ability in constructed wetland were the adjustment of internal structure and improvement of inner microenvironment.
作者 王霞
出处 《电力环境保护》 2007年第2期46-48,共3页 Electric Power Environmental Protection
基金 江苏省教育厅高校科研基金资助项目(2KJB610004)
关键词 潜流人工湿地 机理 脱氮 subsurface flow constructed wetland mechanism denitrification
  • 相关文献

参考文献24

  • 1何亚丽,朱伟萍.利用人工湿地处理小区污水的技术研究[J].许昌学院学报,2003,22(2):49-50. 被引量:9
  • 2夏汉平.人工湿地处理污水的机理与效率[J].生态学杂志,2002,21(4):51-59. 被引量:331
  • 3丁廷华.污水芦苇湿地处理系统示范工程的研究[J].环境科学,1992,13(2):8-13. 被引量:82
  • 4Comin F A, Romero J A ,Astorga V, et al. Nitrogen removal and cycling in restored wetlands used as filters of nutrients for agricultural run off [J]. Wat Sci Tech, 1997,35 (5) :255 -261.
  • 5Andrew Wood. Constructed wetlands in water pollution control:fundamentals to their understanding [ J ]. Wat Sci Tech, 1995,32 ( 3 ) :21 - 29.
  • 6吴晓磊.人工湿地废水处理机理[J].环境科学,1995,16(3):83-86. 被引量:456
  • 7Jan Vymazal. The use of subsurface constructed wetlands for wastewater treatment in the Czech Republic : 10 year's experience[J]. Ecological Engineering,2002, ( 18 ) :633 - 646.
  • 8Brix H. Functions of macrophytes in constructed wetlands [ J ]. Wat Sci Tech,1994, (29) :71 -78.
  • 9Vymazal J. Nitrogen removal in constructed wetlands with horizontal subsurface flow - can we determine the key press [ A ]. In : Vymazal J(eds.). Nutrient cycling and retention in natural and constructed wetlands [ C ]. Leiden : Backhuys Publishers, 1 - 17.
  • 10Reddy K R. Fate of nitrogen and phosphorus in wastewater retention reservior containing aquatic macrophysics [J] . J Environ Qual,1983,12(1) :137 -141.

二级参考文献124

  • 1诸惠昌,胡纪萃.新型废水处理工艺——人工湿地的设计方法[J].环境科学,1993,14(2):39-43. 被引量:93
  • 2李科德,胡正嘉.人工模拟芦苇床系统处理污水的效能[J].华中农业大学学报,1994,13(5):511-517. 被引量:26
  • 3吴晓磊.人工湿地废水处理机理[J].环境科学,1995,16(3):83-86. 被引量:456
  • 4Rydong S 朱萱(译).湖泊与水库富营养化控制[M].北京:中国环境科学出版社,1992..
  • 5[59]Morris,M.and Herbert,R.The design and performance of a vertical flow reed bed for the treatment of high ammonia,low suspended solids organic effluents[J].Water Science and Technology,1997,35(5):197~204.
  • 6[60]Narkis,N.et al.Denitrification at various carbon to nitrogen ratios[J].Water Research,1979,13:93~98.
  • 7[61]Newman,J.M.et al.Seasonal performance of a wetland constructed to process dairy milkhouse wastewater in Connecticut[J].Ecological Engineering,2000,14:181~198.
  • 8[62]Nguyen,L.M.Organic matter composition,microbial biomass and microbial activity in gravel-bed constructed wetlands treating farm dairy wastewaters[J].Ecological Engineering,2000,16:199~221.
  • 9[63]Panswad,T.and Chavalparit,O.Water quality and occurrence of protozoa and metazoa in two constructed wetlands treating different wastewaters in Thailand[J].Water Science and Technology,1997,36(12):183~188.
  • 10[64]Peverly,J.H.et al.Growth and trace metal absorption by Phragmites australis in wetlands constructed for landfill leachate treatment[J].Ecological Engineering,1995,5:21~35.

共引文献1011

同被引文献173

引证文献15

二级引证文献86

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部