摘要
“引江济汉”工程是南水北调中线工程的补偿工程,推荐线—龙高Ⅰ线有70%的渠道经过膨胀土分布区,在渠道开挖和运行过程中,其边坡可能产生胀缩变形破坏,应采取护坡、放坡、沉箱、排水等工程措施解决。
The cannel'leading water from Yangtze River to Hanjiang River' is a compensation project in middle section of the northward water transportation. The preferred Longgao-1 cannel goes through the expansion clay where the fiver bank may undergo deformation damage of expansion-contraction, unless some measures are applied such as slope maintenance, slope lowering, box-sinking and drainage system.
出处
《资源环境与工程》
2007年第2期144-146,共3页
Resources Environment & Engineering
基金
国土资源大调查项目"汉江中下游环境地质调查"成果之一
项目编码:200312300007
关键词
引江济汉
膨胀土
渠道边坡稳定性
对策
Leading water from Yangtze to Hanjiang fiver' expansion clay
stability of bank slope
countermeasures