期刊文献+

基于ProActive的并行计算任务调度器的研究 被引量:1

Research on Scheduler for ProActive-based Parallel Computing
下载PDF
导出
摘要 ProActive在开发并行计算及网格应用中很受欢迎,但目前还没有可用于基于ProActive的并行计算的任务调度器,在对相关技术进行研究后,给出了一个简单有效的任务调度器的实现方案,介绍了其技术细节。将其应用于开发的基于ProActive的并行计算支持平台中进行了实验,实验结果表明该调度器是可行和有效的。 ProActive is popular in parallel computing and grid programming, however there isn't a suit scheduler for ProActive-based parallel computing. This paper proposes a scheduler, and all technologies are introduced. Realized scheduler is used in a ProActive-based platform for parallel computing. Experiment demonstrates it is feasible and valid.
出处 《计算机工程》 CAS CSCD 北大核心 2007年第7期73-74,91,共3页 Computer Engineering
基金 广西大学科研项目(CC1402 CC1407)
关键词 活动对象 调度器 负载平衡 PROACTIVE Active object Scheduler Load balance F roActive
  • 相关文献

参考文献6

  • 1Caromel D.ProActive[Z].2005-12-25.http://www-sop.inria.fr/oasis/proactive.
  • 2Huet F,Caromel D,Henri E.High Performance Java Middleware with a Real Application[C]//Proc.of Super Computing Conference,Pittsburgh (PA),USA.2004-11.
  • 3Xu Baomin,Lian Weimin,Gao Qiang.Migration of Enterprise JavaBeans with ProActive Interposition Objects[J].SIGPLAN Notices,2003,38(8):22-28.
  • 4Campos L M,Scherson I D.Rate of Change Load Balancing in Distributed and Parallel System[J].Parallel Computing,2000,26(9):1213-1230.
  • 5黄金贵,陈建二,陈松乔.网络集群计算系统中的并行任务调度[J].计算机学报,2004,27(6):765-771. 被引量:16
  • 6董明刚,梁正友.Windows下基于ProActive并行计算的关键技术[J].计算机工程,2006,32(19):105-107. 被引量:8

二级参考文献15

  • 1Hall L.A.. Approximation algorithms for scheduling. In: Hochbaum D.S. ed.. Approximation Algorithms for NP-hard Problems. New York: PWS Publishing Company,1997,1~45
  • 2Lee C.-Y., Lei L., Pinedo M.. Current trends in deterministic scheduling. Annual Operations Research,1997, 70: 1~42
  • 3Hoogeveen J.A., van de Velde S.L., Veltman B.. Complexity of scheduling multiprocessor tasks with prespecified processor allocations. Discrete Applied Mathematics, 1994, 55: 259~272
  • 4Blazewicz J., Dell'Olmo P., Drozdowski M., Speranza M.. Scheduling multiprocessor tasks on the three dedicated processors. Information Processing Letters, 1992, 41: 275~280
  • 5Goemans M.X.. An approximation algorithm for scheduling on three dedicated machines. Discrete Applied Mathematics, 1995, 61: 49~59
  • 6Huang J.G., Chen J., Chen S.Q.. A simple linear time approximation algorithm for multiprocessor job scheduling on four processors. In: Hsu Tsan Sheng ed. Algorithms and Computation, LNCS 1969. Berlin: Springer, 2000, 60~71
  • 7Chen J., Huang J.G.. Semi-Normal Schedulings: Improvement on Goemans. In: Tadao Takaoka ed. Algorithms and Computation, LNCS 2223. Berlin: Springer, 2001, 48~60
  • 8Chen J., Lee C.-Y.. General multiprocessor tasks scheduling. Naval Research Logistics, 1999, 46: 59~74
  • 9Bellare M., Goldreich O., Sudan M.. Free bits, PCPs and nonapproximability--towards tight results. SIAM Journal on Computing, 1998, 27: 804~915
  • 10ProActive[Z].http://www-sop.inria.fr/oasis/proactive.

共引文献22

同被引文献3

  • 1董明刚,梁正友.Windows下基于ProActive并行计算的关键技术[J].计算机工程,2006,32(19):105-107. 被引量:8
  • 2GREVE F,HURFIN M,LE NARZUL J P.OPEN EDEN:a portable fault tolerant CORBA architecture[C]// 2nd International Symposium on Parallel and Distributed Computing.Slovenia:IEEE,2003:88-95.
  • 3CAROMEL D.ProActive[EB/OL].[2007-03-01].http://www.sop.inria.fr/oasis/ProActive/2007.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部