期刊文献+

黄河小浪底水利枢纽工程地质问题及其处理措施 被引量:5

Engineering geological problems of Xiaoliangdi key water control project Yellow River and their disposal measures
下载PDF
导出
摘要 本文不同详细程度地分析研究了由世界银行特别技术信贷、中外多家著名施工单位参加正在兴建的黄河小浪底水利枢纽特大型工程在治黄中的作用,工程地质概况、区域稳定性、坝基稳定性、地下工程稳定性和边坡稳定性等工程地质问题及其处理措施.最后还指出了在红色碎屑岩层中修建水利水电工程亟待进一步研究解决的几个课题。 Engineering geological problems and their disposal measures in Xiaoliangdi key water contiol project in Yellow River constructed by many famus overseas and demestic construction corporations and technologically creditdcl by the World Band, are detailed to varius extent. These problems and measures include the role of the project in Yellow River control, its engineering geclogy situation regional stability, dam foundation stability, underground construction stability,slope stability, and their disposal measures. Finally, som problems, need further studies for water conserancy and hydropower project's construction in red clastic rocks are put forward.
出处 《水文地质工程地质》 CAS CSCD 1997年第2期7-11,共5页 Hydrogeology & Engineering Geology
关键词 水利枢纽 边坡稳定 工程地质 处理措施 key water control project, red clasic rock, slope stability, argillaceous intercalation, monitoring
  • 相关文献

参考文献1

共引文献4

同被引文献35

引证文献5

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部