摘要
本文不同详细程度地分析研究了由世界银行特别技术信贷、中外多家著名施工单位参加正在兴建的黄河小浪底水利枢纽特大型工程在治黄中的作用,工程地质概况、区域稳定性、坝基稳定性、地下工程稳定性和边坡稳定性等工程地质问题及其处理措施.最后还指出了在红色碎屑岩层中修建水利水电工程亟待进一步研究解决的几个课题。
Engineering geological problems and their disposal measures in Xiaoliangdi key water contiol project in Yellow River constructed by many famus overseas and demestic construction corporations and technologically creditdcl by the World Band, are detailed to varius extent. These problems and measures include the role of the project in Yellow River control, its engineering geclogy situation regional stability, dam foundation stability, underground construction stability,slope stability, and their disposal measures. Finally, som problems, need further studies for water conserancy and hydropower project's construction in red clastic rocks are put forward.
出处
《水文地质工程地质》
CAS
CSCD
1997年第2期7-11,共5页
Hydrogeology & Engineering Geology
关键词
水利枢纽
边坡稳定
工程地质
处理措施
key water control project, red clasic rock, slope stability, argillaceous intercalation, monitoring