隧道高地温应对措施及通风设计——高黎贡山铁路特长隧道可行性研究 被引量:44

Countermeasures against high temperatures in a tunnel and the corresponding ventilation design——Feasibility study for the super-long Gaoligonshan tunnel
下载PDF
导出
摘要 文章针对高黎贡山铁路隧道高地温地质情况,通过工程类比并结合理论计算,分析了高地温病害产生的机理及其对工程的不利影响;简要介绍了国内外高地温隧道的工程现状及对隧道高地温病害的应对措施,并着重阐述了高地温隧道的施工通风及运营通风计算方法。可供类似工程参考。 According to the geology of Gaoligongshan tunnel, the mechanism of high geo - temperature and its adverse effect on construction were analyzed by engineering analogy and theoretical computation. The paper also briefly introduces the present situation about the tunnels with high geo - temperatures and the corresponding counter- measures both in China and abroad, and describes in detail the method of computation for the construction and operation ventilation for a tunnel with high geo -temperatures. The study can be taken for reference by similar projects.
作者 谷柏森
出处 《现代隧道技术》 EI 北大核心 2007年第2期66-71,共6页 Modern Tunnelling Technology
关键词 深埋隧道 高地温病害 应对措施 通风设计 Deep tunnel High geo - temperature Countermeasures Ventilation design
  • 相关文献

参考文献4

  • 1中华人民共和国铁道部.TB 10068-2000 铁路隧道运营通风设计规范[S].2002
  • 2中华人民共和国卫生部.GBZ 1-2002 工业企业设计卫生标准[S].2004
  • 3国家煤矿安全监察局.煤矿安全规程[S].2005
  • 4桥隧工程网.高地温环境下的隧道隔热、防水、堵水技术及支护材料、结构形式研究报告[R].2006

共引文献11

同被引文献474

引证文献44

二级引证文献253