铁路通信工程项目成本控制途径 被引量:3

铁路通信工程项目成本控制途径
下载PDF
导出
摘要 根据宁启铁路通信工程项目管理经验,介绍铁路通信项目加强成本控制的10个途径,其分别为:成本管理要以人为本;开拓市场,从外部挖潜,提高整体效益;认真会审图纸,提出有科学依据的合理化建议,争取得到业主和设计单位的认同;优化项目施工组织设计和资源配置;动态控制;控制工程直接成本;控制工程的间接成本;加强质量管理,控制工程质量成本;加强安全管理,控制安全事故对工程成本的影响;加强合同管理,做好调概索赔工作。 This article, based on the management experience project, makes an introduction on 10 ways of of the Ning - Qi railway communication engineering strengthening cost control of railway communication projects, viz. cost management being people orientated; opening up market and tapping the potential from the outside to improve integral effects; earnestly making drawings review, putting forward reasonable proposals with scientific basis, and trying to get the consent of customers and designers; optimizing project construction organization design and resources distribution; adopting dynamic control; exercising control of project direct cost; exercising control of project indirect cost; strengthening quality control and exercising control of engineering quality cost; promoting safety management & controlling the impacts of safety accidents on engineering cost; and bettering contract management & doing a good job of budget adjustment and claims making
出处 《铁路工程造价管理》 2007年第2期18-21,共4页 Railway Engineering Cost Management
关键词 铁路 通信工程 成本控制 Railway communication engineering cost control
  • 相关文献

同被引文献14

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部