期刊文献+

发电企业与电网企业交易中利益均衡的多目标规划模型 被引量:2

Programming of Multi-objective of the Balanced Behalf in Business between the Power Enterprise and Grid Corporation
下载PDF
导出
摘要 随着电力市场改革的进行,发电企业与电网企业已经分开,这样则势必会给电力市场的正常运营带来了一定的风险。为了能够维持电力市场的稳定运行,备用电能市场应运而生。企业双方不但需要在主电能市场进行交易,同时也会在备用电能市场进行电能交易。企业双方在进行交易的时候,其目的都是为了能够实现自身利益的最大化,但是如果双方在这一目的下进行交易,则会影响对方利益的实现,这样就会使交易不一定能够进行下去,只有在一定条件下能够使双方的利益均实现最大化,才能使交易正常稳定的进行下去。这也就是此模型中所说的双方的利益均衡。这一模型研究的就是在这一基础上利用多目标规划进行的,研究双方在进行交易时应如何调配两个市场的电能容量才能够使双方的利益均达到最大化。 With the reform of electrical market, the power enterprises and grid corporations have already been separated, in that way risks will take place during the normal operation of the power market. Reserve market appeared to maintain the system. The two enterprises must bargain not only in main electrical market, but also in the spare market. When they conduct transaction, they both want to achive the maximum profit of their own, but, it may influence the profit of the other one. No other than to a certainty conditions, it could make the two enterprises both gain the most profit, and it also could bargain in a steady way. This bring forward the balanced behalf appeared in the model. This re- search is based on that situation and using the programming of multi-objective, and this article studies how to distribute the energy in the two markets to make the both parties achieve the benefit maximization.
出处 《现代电力》 2007年第1期84-87,共4页 Modern Electric Power
基金 国家自然科学基金项目(70373017) 国家自然科学基金项目(70571023) 国家自然科学基金项目(E0903)
关键词 主电能市场 备用市场 容量 利益最大化 利益均衡 main electrical market reserve market the capability of energy benefit maximization balanced behalf
  • 相关文献

参考文献8

二级参考文献51

共引文献84

同被引文献22

  • 1姚建刚,周启亮,张佳启,黄攀.基于期权理论的发电权交易模型[J].中国电机工程学报,2005,25(21):76-81. 被引量:53
  • 2徐玮,康重庆,揣小勇,梁炜皓,李金凤.基于不确定型电力电量平衡的电网企业购电成本分析[J].电网技术,2006,30(21):15-20. 被引量:15
  • 3Woo C K, Karimov R I, Horowitz I. Managing elec- tricity procurementcost and risk by a local distribution company[J]. Energy Policy,2004,32(5) :635-645.
  • 4Woo C K, Horowitz I, Olson A, et al. Efficient fron- tiers for electricityprocurement by an LDC with multiple purchase options[J]. Omega, 2006,34 (1) : 70-80.
  • 5Sioshansi F P. The emergence of trading and risk management inliberalized electricity markets[J]. En- ergy Policy,2002,30(6) :449-459.
  • 6Denton M, Palmer A, Masiello R, et al. Managing market risk inenergy[J]. IEEE Transations on Power Systems, 2003,18(2) : 494-502.
  • 7Woo C K, Horowitz I, Hoang K. Cross hedging and forward-contractpricing of electricity[J]. Energy Eco- nomics,2001,23(1) :1-15.
  • 8杨珊珊.基于博弈论的我国发电企业竞价策略研究[D].哈尔滨:哈尔滨理工大学管理学院,2013.
  • 9CHENG D. Economic analysis of the electricity market in england and wales [ J ]. IEEE Power Engineering Review, 2009,19(4) :57-59.
  • 10GREEN R J. The electricity contract market in England and Wales[ J]. Journal of Industrial Economics, 2009,47 ( 1 ) : 107-124.

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部