摘要
与传统的体育场馆预制看台板相比,国家体育馆看台板为现场浇筑成型。看台板结构复杂,且成型质量要求高,施工中经过细致的模板节点设计,并在施工中严格执行模板施工方案,国家体育馆看台板混凝土成型效果达到了清水混凝土的要求。
Contrasting with traditional stadium prefabricated stand slab, the National Stadium stand slab is castin-situ. The structure of stand slab is complicated, and the requirements of shaping quality are high. By carefully design of formwork joints and strictly complementation of formwork construction scheme, the shaping effect of the National Stadium concrete stand slab satisfied the demands of as-cast-finish concrete.
出处
《施工技术》
CAS
北大核心
2007年第4期27-28,共2页
Construction Technology
关键词
国家体育馆
现浇看台板
模板节点设计
清水混凝土
National Stadium
cast-in-situ stand slab
formwork joint design
as-cast-finish concrete