摘要
根据我厂焦化项目一期工程煤气净化系统及辅助系统存在的问题,在二期工程中对部分工艺和装置进行了调整,同时设计时考虑了新老系统间的衔接。
In accordance with some existing problems of gas purification and auxiliary system in the first Project, some processes and devices have been adjusted in the second project as well as the joint between old and new systems are also considered while designing.
出处
《南钢科技与管理》
2007年第1期9-12,共4页
NISCO Technology and Management
关键词
焦炉
煤气净化
设计
coke oven
gas purification
design