摘要
以送变电工程公司最近施工的项目“大城—留各庄110 kV线路工程”为例,结合作者最近编制的土石方量计算程序介绍了VEP程序的设计思路及方法。
Taking Dacheng-Liugezhuang 110 kV transmission line engineering as an example, of which were constructed recently by the transmission line and substation engineering company, designing idea and method for VEP program are introduced in combination with the program of earthworks calculation designed by the article writer.
出处
《华北电力技术》
CAS
2007年第A01期60-63,66,共5页
North China Electric Power
关键词
土石方量计算
软件程序
earthworks calculation
VEP program