投料倒置A^2O工艺在南桥污水处理厂改造中的应用 被引量:4

Application of Reversed-moving Bed A^2O Process in Upgrading of Nanqiao WWTP
下载PDF
导出
摘要 南桥污水处理厂原先采用传统活性污泥法工艺,构筑物布置紧凑,占地面积较少。为了增加脱氮除磷功能,需要对其进行改造,要求在不新征土地,不增加构筑物的条件下,达到GB18918-2002《城镇污水处理厂污染物排放标准》的二级标准的排放要求,具有相当的技术难度。经过大量前期调研,采用同济大学开发的投料倒置A2O工艺进行改造。运行效果表明,该工艺具有停留时间短、处理效率高、具有同步硝化和反硝化的功能,同时对磷的去除也较好,对于面临同样问题的污水厂改造具有一定的借鉴意义。 Conventional activated sludge, process was adopted in Nanqiao WWTP. It is necessary to upgrade the plant to satisfy the second grade of 〈municipal wastewater treatment plant pollutant discharge standard〉(GB18918-2002) without new area and building. It is very imPortant that the reversed-moving bed A^2O process, which was invented by Tongji University, was adopted; it was judged that HRT, treatment efficiency and simultaneous nitrification and denitrification were all better than conventional A^2O process.
出处 《江苏环境科技》 2007年第2期35-36,共2页
关键词 倒置投料A^2O 脱氮除磷 应用 Reversed-moving bed A^2O process Denitridation and dephosphorigation Application
  • 相关文献

参考文献6

  • 1费庆志,于波,许芝.好氧生物流化床技术探讨[J].净水技术,2004,23(2):28-30. 被引量:4
  • 2张景丽,幸福堂.移动床生物膜工艺特点、研究现状及发展[J].工业安全与环保,2003,29(4):13-15. 被引量:36
  • 3赵旭涛,顾国维.硝化作用特性分析及讨论[J].环境科学研究,1995,8(1):45-47. 被引量:23
  • 4Yutaka Suzuki.Development of Simulation Model for a Combined Activated-Sludge and Biofilm Process to Remove Nitrogen and Phosphorus[J].Water Environment Research,1999,71(7/8):388-397.
  • 5Robertson L A,Van Niel E W J.Simultaneous Nitrification and Denitrification Aerobic Chemostat Cultures of Thiosphaera Pantotropha[J].Applied Environmental Microbiology.1998,54(1):2 812-2 818.
  • 6Liu J X,Groenestijn J W,Doddenma H J,et al.Removal of Nitrogen and Phosphorus Using A New Biofilm-Activated-Sludge System[J].Wat Sci Tech,1996,34(1/2):315-322.

二级参考文献26

  • 1周平,王世和.生物膜厚度对流化床反应器性能影响分析[J].环境科学,1994,15(2):1-5. 被引量:12
  • 2韦朝海,梁世中,吴超飞.废水处理生物流化床中O_2传递特性的研究[J].环境科学与技术,1996(1):13-16. 被引量:11
  • 3[1]H.Ф deegaard.Advanced compact wastewater treatment based on coagulation and moving bed biofilm processes.Water Science and Technology Vo142 No12 pp33~48
  • 4[5]M.X.Loukidou,A.I.Zouboulis.Comparision of Biological Treatment Processes using Attached-growth Biomass for Sanitary Landfill Leachate Treatment.Environmental Pollution 111(2001):273~281
  • 5[8]Yutaka Suzuki et al,Development of Simulation Model for a Combined Activated-Sludge and Biofilm Process to Remove Nitrogen and Phosphorus Water Environment Research Vo1.71 No.4 1999.7/8 pp388~397
  • 6[9]H.Helness,H.Qd egaard Biological Phosphorus Removal in a Sequencing Batch Moving Bed Biofilm Reactor.Water Science & Technology Vo1.40,No,4~5,pp:161~168
  • 7[10]G.Andreottola et al.Upgrading of a Small Wastewater Treatment Plant in a Cold Climate Region Using a Moving Bed Biofilm Reater(MBBR) System.Water Science & Technology Vo141 No 1 pp177~185
  • 8[11]C.S.RA et al.Biological Nutrient Removal with an Internal Organic Carbon Source in Piggery Wastewater Treatment.Wat.Res.Vo1.34,No.3,pp.965~973,2000
  • 9[12]U.WELANDER et al.Biological Nitrogen Removal from Municipal Landfill Leachate in Pilot Scale Suspended Carrier Biofilm Process.Wat.Res.Vo1.32,No.5,1564~1570,1998
  • 10周平,汪诚文,吴晓磊,钱易.内循环生物流化床处理石化废水的中试研究[J].环境科学,1997,18(1):26-29. 被引量:35

共引文献60

同被引文献11

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部