5CHAN F T S, CHAN H K. A new model for manufacturing supply chain networks, a multiagent approach [J]. Journal of Engineering Manufacture, 2004, 218(4) :443-454.
6REID R. Stop and read before implementing MRPII/ ER[J]. Canadian Plastics, 2006, 64 (8): 2-6.
7SLACK N. The blackwelI encyclopedic dictionary of operations management[M]. United States: Wiley, 2005.
8KOH S C L, SIMPSIN M, LIN Y. Uncertainty and contingency plans in ERP-controlled manufacturing environments [J]. Journal of Enterprise Information Management, 2006, 19(6) : 625-645.
9KIM S-II, CHOI H S, LEE D H. Scheduling algorithms for parallel machines with sequence- dependent set-up and distinct ready times., minimizing total tardiness[J]. Journal of Engineering Manufacture, 2007, 221(6) : 1087-1096.
10ENGLAND D M, RAHIMIFARD S, NEWMAN S T. Bridging the gap between volume and variety oriented production systems for the automotive industry [J]. International Journal of Computer Integrated Manufacturing, 2005, 18(5): 408-417.