广西贵港罗泊湾码头现浇箱梁施工方法

Construction Method of Cast-in-situ Box Girder in Guangxi Guigang Luobo Bay Dock Project
下载PDF
导出
摘要 介绍广西贵港罗泊湾码头现浇箱梁在大跨度高架施工的情况下,采用贝雷桁架作为托架,外悬臂端采用钢管斜支撑的施工方法。为该梁施工避免洪水及船舶影响、减小支架下沉、确保施工安全打下良好基础,同时为同类型大跨度的箱梁施工提供参考。 The construction method of cast-in-situ box girder in Guangxi Guigang Luobo Bay Dock project is presented. In the case of overhead large-span construction, Beret trusses were used as the brackets and the outer ends of cantilevers were supported with inclined steel pipes. By the method, we can avoid the influence from flood and vessels during the construction and reduce the sinking of brackets and thus ensure safe construction. Meanwhile, it can provide a reference for construction of large-span box girders of the same kind.
出处 《水运工程》 北大核心 2007年第4期84-87,共4页 Port & Waterway Engineering
关键词 现浇箱梁 大跨度 高架 施工 cast-in-situ box girder large span overhead construction
  • 相关文献

参考文献3

  • 1公路施工手册,桥涵[K].北京:人民交通出版社,2000.
  • 2JTJ025—86.公路桥涵钢结构及木结构设计规范[S].[S].,..
  • 3JTJ 220-82,混凝土和钢筋混凝土设计[S].

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部