摘要
结合西安市南二环立交桥钢箱梁的制造、安装施工过程,重点阐述梁体总体分块方案、组装焊接技术、预拼装及工地现场安装施工的工艺流程,对关键工艺方案和特殊情况处理提出了解决办法。
Taking the pre-fabrication and installation of the steel box girders of a cloverleaf crossing in Xi'an as project case, the paper presents the segment partition, assembling and welding, trial assembling and in-situ installation of the steel box girders. Furthermore, the paper recommends some countermeasures for the critical construction processes and unusual cases.
出处
《隧道建设》
2007年第2期88-92,共5页
Tunnel Construction
关键词
立交桥
钢箱梁
分块方案
组装焊接技术
安装
cloverleaf crossing
steel box girder
segment partition scheme
assembling and welding technology
installation