摘要 重庆轻轨三号线一期工程火车客站紧邻铁路既有线建筑物,详细介绍了基坑施工中采用浅孔微震爆破进行分层开挖、周边增打减震孔、预留光爆层、再辅以覆盖和围档等降低爆破震速和防止爆破飞石的工程措施,并在爆破中进行了震动速度的监测和观测。既满足了施工进度又确保了建筑物的安全。 The station of Passenger Railway Station on line 3 of Chongqing MRT system is located near existing railways and structures. In the paper, the author describes in detail the countermeasures adopted to minimize the blasting vibration velocities and flying rocks during the construction of the foundation pit of the MRT station, which include layer-bylayer excavation by means of short-hole mini-vibration blasting technology, drilling additional vibration-reducing holes around the foundation pit, preserving smooth-blasting layers, working area covering and protection. Furthermore, monitoring and observation are made on the vibration velocities during blasting. Due to the countermeasures adopted, the requirements of the construction schedule are satisfied and the safety of the structures is guaranteed.
作者 李建高
出处 《隧道建设》 2007年第1期87-90,共4页 Tunnel Construction
关键词 既有线 构(建)筑物 减震 飞石 控制爆破 existing railway buildings and structures vibration control flying rock controlled blasting
  • 相关文献

参考文献1

  • 1[4]刘殿中,杨仕春.工程爆破实用手册[M].北京:冶金工业出版社,2004.

共引文献1

同被引文献27

引证文献4

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部