摘要
近几年随着城市的发展,工业项目的增多,需要建设较多的高压变电站,以满足区域用电负荷的增长。高压变电站的建设带来一系列的环境问题,如运行期产生的电磁场、无线电干扰、噪声污染及污废水等。以南宁500 kV变电站工程为例,针对高压变电站工程运行期间环境影响的特点,提出切实可行的污染防治措施,以减轻工程建设对环境的影响。
Following the development of city and the increase of industry projects in recent years, more and more extra high-voltage substations are constructed to meet the soaring demand for electricity. Many environmental problems , such as electromagnetic field and radio interference disturbance, noise pollution and waste water, appear with the construction of extra high-voltage substations. Taking Nanning 500 kV substation as example, this paper analyzes the environmental impacts by extra high-voltage substations during operation and puts forward the practical and feasible prevention measures, which can reduce the negative impacts by project construction.
出处
《广西电力》
2007年第2期12-14,23,共4页
Guangxi Electric Power
关键词
高压变电站
环境影响
防治措施
extra high-voltage substations, environmental impact, prevention Measure