面向绿色制造的机械加工系统任务优化调度模型 被引量:37

JOB SCHEDULING MODEL OF MACHINING SYSTEM FOR GREEN MANUFACTURING
下载PDF
导出
摘要 机械加工系统是车间层实施绿色制造的主体之一,对加工任务进行优化调度可以减少机械加工系统所产生的环境影响和资源消耗,是改善机械加工系统绿色性(即资源消耗和环境影响特性)的途径之一。基于此对面向绿色制造的机械加工系统任务优化调度问题进行研究,构建其框图模型及数学模型,该模型能对调度问题的整个优化调度过程及所涉及的各种要素之间关系进行描述。结合机械加工系统的资源消耗和环境影响特性,建立该模型的目标体系,该体系包括优化调度问题所涉及的各个子目标,并对子目标的内容进行描述。最后通过案例,对面向绿色制造的机械加工系统任务优化调度模型进行应用分析。 A machining system is one of important elements for implementing green manufacturing in workshop. It has been discovered that job scheduling, which can decrease resource consumption and reduce environmental impacts, is an approach to improving green attributes of machining systems. A job scheduling model of a machining system for green manufacturing is proposed with description of the schematic model and the mathematic model, which describes the whole scheduling process and the relations of the elements of the job scheduling model. The objective architecture of the model is constructed in terms of the green attributes of machining systems which is composed of several sub-objectives, and the analysis of each sub-objective is presented. Finally, a case study is analyzed to show the application of the model.
出处 《机械工程学报》 EI CAS CSCD 北大核心 2007年第4期27-33,共7页 Journal of Mechanical Engineering
基金 国家自然科学基金(50475062) 国家科技支撑计划(2006BAF02A03) 重庆市自然科学基金(2004-47-19)资助项目。
关键词 绿色制造 调度 机械加工系统 环境影响 Green manufacturing Scheduling Machining systems Environmental impacts
  • 相关文献

参考文献13

  • 1DAHMUS J B, GUTOWSKI T G. An environmental analysis of machining[C]//Proceedings of International Mechanical Engineering Congress and RD&D Expo,2004,12: 1-10.
  • 2MUNOZ A A, SHENG P. An analytical approach for determining the environmental impact of machining process[J]. Journal of Material Processing Technology,1995, 53: 736-758.
  • 3BENNETT D P, YANO C A. A decomposition approach for an equipment selection and multiple product routing problem incorporation environmental factors[J]. European Journal of Operational Research, 2005, 156: 643-664.
  • 4KOULAMAS C, KYPARISIS G J. Makespan minimization on uniform parallel machines with release times[J].European Journal of Operational Research, 2004, 157:262-266.
  • 5AZIZOGLU M. Preemptive scheduling on identical parallel machines subject to deadlines[J]. European Journal of Operational Research, 2003, 148: 205-210.
  • 6胡仕成,徐晓飞,战德臣.一种面向成本优化的生产计划调度算法[J].计算机集成制造系统-CIMS,2003,9(9):735-739. 被引量:7
  • 7李卫星.现代生产管理[M].北京:中国商业出版社,1997.
  • 8HE Yan, LIU Fei, CAO Huajun, et al. A bi-objective model for the job-shop scheduling problem to minimize both energy consumption and makespan[J]. Journal of Central South University of Technology, 2005, 12 (s2):167-171.
  • 9LiuFei,CaoHuajun,ZhangHua,YuanChuanping.NOISE REDUCTION SCHEDULING METHOD IN A SHOP FLOOR AND ITS CASE STUDY[J].Chinese Journal of Mechanical Engineering,2003,16(4):337-339. 被引量:5
  • 10曹华军,刘飞,阎春平,李聪波.制造过程环境影响评价方法及其应用[J].机械工程学报,2005,41(6):163-167. 被引量:33

二级参考文献20

  • 1陆雍森.环境评价[M].上海:同济大学出版社,1989..
  • 2机械工程手册电机工程手册编辑委员会.机械工程手册:机械制造工艺及设备卷(二)[M].北京:机械工业出版社,1997..
  • 3天津大学机械噪声研究组 张策.机床噪声--原理及控制[M].天津:天津科学技术出版社,1984..
  • 4NUDTASOMBOON N, RANDHAWA S U. Resource-constrained project scheduling with renewable and non- renewable resources and time-resource tradeoffs[J]. Computers Industrial Engineering, 1997, 32(1): 227-242.
  • 5DE REYCK B, HERROELEN W. A branch-and- bound procedure for the resource - constrained project scheduling problem with generalized precedence relations [J]. European Journal of Operational Research, 2000, 111 (1): 152 - 174.
  • 6BRUCKER P, DREXL A, et al. Resource-constrained project scheduling: notation, classification, models, and methods[J]. European Journal of Operational Research, 1999, 112(1): 3-41.
  • 7PHILIPPE B, CLAUDE LE P. Constraint propagation and decomposition techniques for highly disjunctive and highly cumulative project scheduling problems[J]. Constraints, 2000, 5(1/2),119-139.
  • 8ODDI A, SMITH S F. A constraint-based method for project scheduling with time windows[J]. Journal of Heuristics,2002, 8(1):109-136.
  • 9FRANCK B, NEUMANN K, SCHWINDT C. Truncated branch-and-bound, schedule-construction, and schedule - improvement procedures for resource- constrained project scheduling[J]. OR-Spektrum, 2001, 23(3): 297-324.
  • 10KOLISH R. Serial and parallel resource-constrained project scheduling methods revisited: theory and computation[J]. European Journal of Operational Research, 1996, 90 : 320- 333.

共引文献42

同被引文献357

引证文献37

二级引证文献314

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部