玲珑金矿255水平主运巷锚注加固技术研究 被引量:3

STUDY ON TECHNIQUE OF THE REINFORCE OF GROUTING AND BOLTING OF SUBSIDING AREA IN 255 MAIN TRANSPORT ROADWAY OF LINGLONG GOLD MINE
下载PDF
导出
摘要 玲珑金矿255水平主运巷发生严重塌陷,破坏矿区的安全生产。塌陷区现场条件复杂、未知因素多。在分析巷道围岩特性的基础上,依据现场实际情况,提出锚注加固技术治理方案。论述锚注加固方案设计的原则,分析锚注加固技术的关键点。介绍注浆和锚固钢筋的设计,包括注浆半径、注浆孔的布置、注浆材料的配和比,以及钢筋和注浆孔的长度及相互间的位置关系。 The severe subsiding area had happened in the 255main transport roadway of Linglong Gold Mine, which damaged secure production. The geology of subsiding area is complicated with many unknown cases. The grouting and bolting technique is designed based on analysis of surrounding rock in roadway and actual conditions in spot. The design laws and cruxes of the grouting and bolting are described. The design methods of it are presented, including grouting holes radius and location , material ratio and length of reinforcement bars and holes, inter-relations of them are included too.
出处 《中国矿业》 北大核心 2007年第4期64-66,共3页 China Mining Magazine
关键词 塌陷区 注浆设计 锚注加固 Subsiding area Grouting designing Reinforcement of grouting and bolting
  • 相关文献

参考文献3

二级参考文献2

  • 1蔡美峰.地应力测量原理和技术[M].北京:科学出版社,2000.38-68.
  • 2王思敬.作为现代学科的岩石力学研究与实践[A]..中国岩石力学与工程学会第五次学术大会论文集[C].北京:中国科学技术出版社,1998..

共引文献25

同被引文献8

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部