期刊文献+

延长焦炭塔疲劳寿命的措施及设计技术的进步 被引量:3

MEASURES INTENDED TO INCREASE COKE DRUM FATIGUE LIFE AND INNOVATIONS IN DESIGN
下载PDF
导出
摘要 焦炭塔失效的主要形式是裙座的开裂和壳体鼓包。随着生焦周期的缩短,对焦炭塔疲劳寿命的要求越来越高,文章列举了一些延长焦炭塔疲劳寿命的有效措施以及设计技术上取得的进步。 Skirt cracking and shell bulging is the major reason for coke drum to lose its efficient. Longer and longer fatigue life is required with shorter and shorter coke formation cycles of coke drum.Here introduces some effective measures for protracting coke drum service life and some technical innovations in design in this article.
出处 《石油化工设备技术》 CAS 2007年第2期1-5,共5页 Petrochemical Equipment Technology
关键词 焦炭塔 开裂 鼓包 选材 锻焊结构 冲击韧性 Coke drum cracking bulging material selection forge welding structure Impact toughness
  • 相关文献

参考文献12

  • 1Proceeding department, API. 46th midyear meeting, 1981/5/11-14, chicago, Illinoins, 60, P. 141-150
  • 21996 API:COKE DRUM SURVEY Final Report July 21, 1998
  • 3COKE DRUM DESIGN-LONGER LIFE THROUGH INNOVATION-1999.12
  • 4INNOVATIONS IN DELAYED COKING COKE DRUM DESIGNPVP-Vol. 388, Fracture, Design Analysis of Pressure Vessels, Heat Exchangers, Piping Components, and Fitness for Service-1999 ASME1999
  • 5贾桂茹,顾一天.焦炭塔设计中几个问题的探讨[J].石油化工设备技术,2003,24(6):1-5. 被引量:5
  • 6秦瑞歧.焦化装置标定程序[M].北京:中国石化出版社
  • 7顾一天,龙秀兰,贾桂茹.大型焦炭塔的设计[J].石油化工设备技术,2001,22(1):4-8. 被引量:14
  • 8Coke Drum Design: Reliability Through Innovation NPRA Annual Meeting March 19-21,2006
  • 9API publication 938“An Experimental Study of Causes and Repair of Cracking of 11/4 Cr-1/2 Mo-Si Steel Equipment”.
  • 10莫少明,马颖,刘海滨,孙雨,傅家仁,顾一天.φ8800mm焦炭塔的焊后整体热处理[J].石油化工设备技术,2004,25(6):7-12. 被引量:9

二级参考文献10

  • 1李祖贻.延迟焦化装置设备状况分析[J].石油化工腐蚀与防护,1994,11(3):1-7. 被引量:2
  • 2刘宗良(译).美国石油学会对焦炭塔破裂实例的考察[J].-,1981,:511-14,141.
  • 3中国石化工程建设公司 淄博北岳防腐公司.大型铬钼钢塔器背带式保温结构[P].中国,ZL 01243629.1,2002..
  • 41996. API COKE DRUM SURVEY Final Report July21,1998.
  • 5COKE DRUM DESIGN LONGER LIFE THROUGH INNOVATION Charles J (Chuek)Pieper, Lestle R (Ron) Shoekley, and Coby W Stewart.
  • 6ANALYSES OF ALTERNATE SKIRT ATTACHMENTS TO COKE DRUMS PVPV01. 315, Fitness-for-Service and Decisions for Petroleum and Chemical Equipment ASME1995.
  • 7INNOVATIONS IN DELAYED COKING COKE DRUM DESIGN PVP- Vol. 388, Fracture, Design Analysis of Pressure Vessels, Heat Exchangers, Piping Components, and Fitness for Service- 1999, ASME1999.
  • 8UNDERSTANDING FAILURE MECHANISMS TO IMPROVE RELIABILITY OF COKE DRUMS PVP- Vol. 395, Operations, Applications, and Components-1999 ASME 1999.
  • 9陈吉成.焦炭塔塔体结构设计的改进[J].炼油设计,1998,28(3):42-46. 被引量:4
  • 10刘正芝,戈兆文,苏旭东,刘慕孔.国产15CrMo厚钢板经压力容器制造工艺考核综述[J].石油化工设备技术,1999,20(2):47-54. 被引量:3

共引文献28

同被引文献20

引证文献3

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部