摘要
白水江流域规划开发七级电站,总装机容量53.7万kW,目前已开发完成黑河塘电站,双河电站正在建设中,后续五个电站中的多诺和青龙电站具备开工条件。在白水江水电开发现状的基础上,结合整个电力市场,对两个电站开发的先后顺序进行了分析。
Seven staged hydropower stations with total installed capacity of 537MW are planned to be developed in Baishuijiang River Basin. The Heihetang hydropower station development is completed presently, the Shuanghe hydropower station is under construction . The Duonuo and Qinglong hydropower stations are ready to be constructed in the Following 5 hydropower projects. In this paper, development sequence of the latter two hydropower stations are studied based on current conditions of Baishuihe River Basin Development and entire power market condition.
出处
《四川水力发电》
2007年第2期12-13,32,共3页
Sichuan Hydropower
关键词
白水江
后续电站
开发顺序
选择
Baishuihe
Following hydropower stations
development sequence
selection