摘要
文章介绍了深井降水技术在安庆发电厂复杂地质条件下的应用,分析了在复杂地质条件下大面积深基坑降水的工程经验,总结得出降水场地的地质条件决定了降水方案的选择,并结合主厂房深基坑降水的施工过程,对深井降水技术做进一步的阐述及探讨,为类似深基坑降水施工提供经验和技术依据。
This paper introduced the application of deep well dewatering technique in An'qing power plant. It analyzed the engineering experience of deep foundation pit dewatering in large area with complex geology. The engineering showed that the geological condition of dewatering place decided the selection of dewatering method. Also, with the main plant workshop's construction, this paper made further discussion on the deep well dewatering technology, which provided similar projects with engineering experience and technique basis.
出处
《安徽建筑工业学院学报(自然科学版)》
2007年第2期34-37,共4页
Journal of Anhui Institute of Architecture(Natural Science)
关键词
深基坑
深井降水
渗透系数
应用
deep foundation pit
deep well dewatering
permeability coefficient
application