期刊文献+

定期冲洗式沉沙池三阶段冲洗计算 被引量:3

Calculation on three-stage flushing of periodic-flushing de-silting basin
下载PDF
导出
摘要 依据定期冲洗式沉沙池水力冲洗的原型观测和模型试验,根据水沙运动特征,提出定期冲洗式沉沙池水力冲洗三阶段冲洗过程及划分,分别给出泄空冲洗、溯源冲洗和沿程冲洗各阶段的计算式和有关参数。 Based on the prototype observation and model test made for the periodic-flushing de-silting basin, the process and the division of the three-stage hydraulic flushing are put forward on the basis of the feature of water-sediment movement, and then the calculation formulas and the related parameters for the stages of emptying flushing; retrogressive flushing and the flushing along the basin are given as well.
出处 《水利水电技术》 CSCD 北大核心 2007年第5期8-11,共4页 Water Resources and Hydropower Engineering
关键词 定期冲洗式沉沙池 三阶段冲洗计算 泄空冲洗 溯源冲洗 沿程冲洗 periodic-flushing de-silting basin calculation on three-stage flushing emptying flushing retrogressive flushing flushing along basin
  • 相关文献

参考文献2

  • 1钱宁,周宾.阳武河灌区分水渠首及沉沙池的模型试验和原型观测[C].第一次河流泥沙国际学术讨论会论文集[A].北京:光华出版社1980.941-950.
  • 2武汉水利电力学院.河流泥沙工程学(下)[M].北京:水利电力出版社,1983.

同被引文献35

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部