摘要
本文分析了非溢流碾压混凝土重力坝和碾压混凝土溢流坝各种模板型式的优缺点及其适用性,并提出了几种新型模板,以供碾压混凝土坝工程试用.
The advantages, disadvantages and adaptability or various formwork for overplow or non-overplow gravity dam or rolled concrete are analyzed. Finally, for the project use of rolled concrete dam, some new forms are proposed.
出处
《福州大学学报(自然科学版)》
CAS
CSCD
1990年第3期87-91,共5页
Journal of Fuzhou University(Natural Science Edition)
关键词
混凝土重力坝
碾压混凝土坝
rolled concrete
non-overflow gravity dam
overflow dam
energy dissipation with step chute
horizontal sliding form