摘要
五台县唐家湾水库进水塔基础加固采用了水泥粉喷桩技术。文中介绍了其桩基的设计、施工工艺、施工质量控制及利用静载试验检查加固地基的效果情况。
The pile formed by spouting cement powder is applied in foundation consolidation of intake tower in Wutai County's Tangjiawan Reservoir. The paper introduces the design of pile foundation, the construction technique, the construction quality control and static loading test of pile foundation applied to inspect the consolidation effect.
出处
《山西水利科技》
2007年第2期10-12,共3页
Shanxi Hydrotechnics
关键词
水泥粉喷桩
施工工艺
承载力
静载试验
pile formed by spouting cement powder construction technique bearing capacity static loading test