摘要
文中结合山西省汾河二库大坝冲砂底孔及供水发电洞进口进水塔工程的施工实践,介绍了竖向钢筋电渣压力焊技术的施工工艺,并阐述了该项钢筋连接技术如何提高工效、确保工程施工进度和质量的要求。
In the context of the practice in constructing scour bottom outlet and intake tower of power tunnel of NO.2 Fenhe Reservoir, this paper introduces the construction technique of electric dregs pressure welding for joining vertical reinforcement, and expounds how this technique can raise work efficiency to ensure construction progress and the demand of engineering quality.
出处
《山西水利科技》
2007年第2期18-19,28,共3页
Shanxi Hydrotechnics
关键词
钢筋
电渣压力焊
焊剂
焊接技术参教
reinforcement electric dregs pressure welding welding paste parameter of welding technique