大花水水电站厂房上部钢—混凝土柱结构施工技术综述

Summary of Construction Technology for Structure of Steel-concrete Column on Upper Part of Powerhouse of Dahuashui Hydropower Station
下载PDF
导出
摘要 大花水水电站主厂房上部采用新型焊接箱型钢—混凝土排架柱结构,屋顶采用下弦柱点支撑、螺栓球节点正放四角锥网架结构形式,其工程量大、结构复杂、现场安装难度高、施工工期极紧张。为此,采取了对高达20.7 m的构架柱整柱吊装、对柱内混凝土一次回填完成的施工措施,这不仅节约了施工工期,还取得了一定的经济效益,并为类似工程的施工提供了一定的实践经验。 New welding box-shape-steel-concrete-bay structure is used as upper part of powerhouse of Dahuashui Hydropower Station, and bottom chord beard by point, quadrangular taper grid with bolt-ball-node structure as its roof, the structure of powerhouse is very complex, its construction schedule, therefore, is pressing. Some measures were adopted such as that the column with length of 20.7m was wholly erecting by overhang, concrete was putting into column until full. Those measures can shorten construction time, cut down cost, and be as reference for other similar projects.
作者 田德智 杨文
出处 《贵州水力发电》 2007年第2期65-67,共3页 Guizhou Water Power
关键词 水利水电工程施工 厂房钢-混凝土结构 施工技术 大花水水电站 conservancy and hydropower engineering construction steel-concrete structure of powerhouse construction technology Dahuashui Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部