摘要
通过对软基处理粒料桩干法施工的实践,分析了粒料桩干法施工后对地基原状土扰动产生不良效果和不成桩的原因,提出了粒料桩干法施工的局限性,为类似工程软基处理提供借鉴。
Through practice of granular pile dry construction in soft foundation treatment, this paper analyzes the causes of adverse effects and not pile-forming caused by disturbing foundation undisturbed soil after granular pile dry construction, and proposes the limitation of granular pile dry construction, in order to offer a reference for soft foundation treatment in similar construction.
出处
《山西建筑》
2007年第13期115-116,共2页
Shanxi Architecture
关键词
软基处理
粒料桩
干法施工
soft foundation treatment, granular pile, dry construction