摘要
结合工程实践,介绍了小半径现浇预应力钢筋混凝土空心连续箱梁的设计,探讨了其施工工序,并对现浇梁进行了测试,检测结果表明完全符合设计要求,以推广使用该技术。
Combined with project experience,it introduces the design of the minor radius pre-stressed and hollow continuous box-beam casting in place, discusses the corresponding construction process,and does testing to the beam casting in place.The testing results show the design meeting the corresponding requests,which will generalize this technique.
出处
《山西建筑》
2007年第15期138-139,共2页
Shanxi Architecture
关键词
施工
预应力
空心连续箱梁
construction, inherent stress, hollow continuous box-beam