摘要
主要介绍了齐岳山隧道运用TSP203、地质雷达、红外探测、超前钻探5、m短距离超长钻探进行施工地质超前预报在DK362+277溶腔处的综合应用及溶腔判定、揭示过程情况,并重点阐述了该溶腔的注浆加固施工技术,以供类似工程参考。
It mainly introduces TSP203,geological radar,infrared acquisition,superior drilling and five-meter short-distance super-length drilling of Qiyueshan tunnel construction which adopts comprehensive application of DK362+227.It also exposes the cavity judging and the situation of course,puts emphasis on discussing the constructing skill of plasma-pouring skill,in order to make reference for familiar project.
出处
《山西建筑》
2007年第15期155-156,共2页
Shanxi Architecture
关键词
地质超前预报
溶腔判定揭示
帷幕注浆
geological superior forecast, cavity judging disclosure, curtain plasma-pouring