大型工程项目进度评价研究 被引量:14

Evaluation of the comprehensive progress of projects
下载PDF
导出
摘要 针对大型水电工程项目进度评价问题进行了探讨,并引入了总体进度的概念.在此基础上运用分类加权的方法评价项目进度,并详细介绍了该方法的基本原理和步骤.对总体进度的评价,将投资量作为不同实物工程量的公度指标,同时用权重反映影响进度的各种因素,通过对不同实物工程的完成量分类加权来评价总体进度.最后给出了实际应用的算例. The concept of the comprehensive progress is proposed, after the evaluation of project progress was discussed, and. The weighted-average method is presented,to evaluate the comprehensive progress and the basic principle and steps of this method are given in detail. Investment quantity in this method is taken as the commensurable index, weight is used to reflect the various influences on progress, and the weighted-average is adopted to evaluate the comprehensive progress for the completed quantities of various work quantities. And finally, an example of the actual application is given.
出处 《华中科技大学学报(自然科学版)》 EI CAS CSCD 北大核心 2007年第5期127-129,132,共4页 Journal of Huazhong University of Science and Technology(Natural Science Edition)
关键词 项目评价 总体进度 单位工程 工程量 权重 projects evaluation comprehensive progress unit project work quantity weight
  • 相关文献

参考文献9

二级参考文献14

  • 1王效俐,吴健中.风险型多目标决策的非线性规划模型[J].决策与决策支持系统,1995(1):54-59. 被引量:4
  • 2冯俊文.风险型多目标决策的模型体系[J].系统工程与电子技术,1994,16(1):21-29. 被引量:3
  • 3[3]Cooper R, W b Chew. Coutrol tomorrow' s cost through today' s desgin[J]. Harvard Business Review, 1996,74(1) :88-89.
  • 4[4]L Sunde, S Lichtenberg. Net-present-Value Cost/Time Tradeoff[J].Project Management, 1995, 13(1) :45-49.
  • 5中华人民共和国水利部,水利水电工程设计概(估)算费用构成及计算标准,1998年
  • 6Bellman R, Zadeh L A. Decision making in a fuzzy environment[J]. Management Science, 1970, 17(4):141-164
  • 7Mareschal B. Stochastic multicriteria decision making and uncertainty [J]. European Journal of Operational Research, 1986, 26:58-64
  • 8Eskandari A, Ffolliott P, Szidarovszky F. Uncertainty and method choice in discrete multi-objective programming problem[J]. Applied Mathematics and Computation, 1995(69): 335-351
  • 91,William J.Rasdorf andOsama Y.Abudayych. Cost- and Schedule-Control Integration: Issues and Needes. Journal ofConstruction Engineering and Management, 4, ASCE , 486-500,1990
  • 102,Neil,J.M.A System for Integrated Project Management.Proc.Conf.on Current Practice inCost Estimating and Const Control,ASCE,138-146,1983

同被引文献75

引证文献14

二级引证文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部