期刊文献+

关于混凝土面板堆石坝监测仪器布置的探讨 被引量:6

Discussion on arrangement of monitoring instruments at concrete face rockfill dams
下载PDF
导出
摘要 在对国内混凝土面板堆石坝监测仪器的布置及运行情况进行总结分析的基础上,探讨了有关面板坝监测仪器布置的几个基本问题,对高坝面板脱空监测的必要性进行了论证,对监测面板混凝土应力的应变计组的选用及布置方向进行了分析,指出面板垂直缝止水防渗与缝后渗水监测的必要性,还对监测项目中常用的监测方法进行了对比分析,强调了仪器选型、施工及观测过程中应注意的主要问题。 Based on a summary of arrangement and practical operation of monitoring instruments at concrete face rock-fill dams, some primary problems were presented. Necessity of monitoring the void on concrete face of high dam was verified. Selection and arrangement direction of strain-gauge arrays, which were used to measure the stress of concrete face, were analyzed. The necessity of water-stopping operation and hind-joint water penetration monitoring for slab vertical joint was pointed out. Some monitoring methods in common use were compared systematically. And some important issues, which more attention should be paid on during the course of instrument setting, construction and monitoring, were emphasized at the same time.
出处 《大坝与安全》 2007年第2期38-42,共5页 Dam & Safety
关键词 面板堆石坝 监测仪器 变形 渗流 应力 concrete face rockfill dam monitoring instrument deformation seepage stress
  • 相关文献

参考文献9

二级参考文献2

共引文献71

同被引文献26

引证文献6

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部