摘要
文章结合江口水电厂启闭机排架加固工程实例,介绍了采用碳纤维材料的加固方法、施工工艺及施工过程中的质量控制要点。经应用表明,用碳纤维加固混凝土构件施工方便、工期短、效果好。
Combined with the hoister bent frame reinforcement in Jiangkou hydropower station ,the paper introduced the method, construction techniques and quality control of the project. Conclusion was gotten that the reinforcement using carbon fiber sheets was of the benefit that easy to construct, short construction period and good effect.