摘要 通过漫湾二期水轮机转轮的加工制造。结合转轮的焊接、铲磨、加工技术及质量控制等方面的要求和相应采用一些新技术、新工艺的科学、合理的施工方法,使漫湾二期转轮在制造上,获得了可喜的成绩,也检验了制造厂家的制造能力和技术水平。 This paper introduces the structure characteristics of hydraulic turbine's runner of Manwan II project, describes the technical requests on the joinfing, shoveling and milling, machining technology and quality controlling, This paper also expatiates how to apply the new technology and technics along with scientific and reasonable machining methods to accomplish satisfying success on the manufacturing of the runner of Manwan Ⅱ project.Then the manufacturing ability and technology level of the manufacturer has been checked and proved.
出处 《水力发电》 北大核心 2007年第5期78-79,90,共3页 Water Power
关键词 漫湾二期水电站 水轮机 转轮 捍接 铲磨 加工 Manwan Ⅱ project hydraulic turbine runner jointing shoveling and milling machining
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部