摘要
大跨径连续箱梁的施工技术是大跨径连续箱梁桥的一个难题。在施工过程中必须按照各种施工技术规格,各方面配合才能很好的完成。A30赵家沟桥在施工方案设计、施工步骤、技术要素等各方面做出了优秀的成绩。
Long-span continuous box girder construction technology of large-span continuous box girder of a problem. During the construction process must be in accordance with the technical specifications in all types of construction, areas with good will be completed. A30 ZhaoJiagou bridge construction program in the design, construction steps and technological factors and other areas have made outstanding achievements
出处
《轨道交通》
2007年第5期56-59,共4页
Rail Transit