摘要
介绍了北京地铁八通线地上轨道铺架施工中,由于受高压线不能拆除的影响,如何在高压线下安全架设简支工型梁的施工技术,介绍了吊机吊梁与人工移梁的相互配合技术,保证了铺架安全按期完成。
Construction technology for the erection of simple-supported H beam under the high-voltage cable in rail construction works in Bawangfen-Tongzhou line of Beijing metro are introduced. Cooperative construction technique combined with crane and manual moving is mentioned, which ensure the completion of works in limit time.
出处
《山西建筑》
2007年第16期141-142,共2页
Shanxi Architecture
关键词
高压线
吊机吊梁
人工移梁
架梁
high-voltage cable, lifting with crane, manual moving, beam erection