结合萧山发电厂天然气发电工程土建B标工程冷却塔工程施工,详细介绍了基础、人字柱、塔筒三大结构部位的施工要点,以完善双曲线冷却塔施工技术,可为同类型冷却塔施工提供借鉴。
Combined with the construction of Xiaoshan power-station natural gas project B, it introduces the constructing points of three structure including the base, man-shaped pile and tower tin, in order to perfect the construction skill of double-curve freezing tower and offer reference for familiar project of freezing tower.
出处
《山西建筑》
2007年第16期147-148,共2页
Shanxi Architecture
关键词
双曲线
冷却塔
施工要点
人字柱
double-curve, freezing tower, construction points, man-shaped pile