摘要 天然气井采气树主控阀门常存在闸门内漏、丝杆弯曲等实际情况,为了消除主控制阀带来的安全隐患,研究了一种专用堵塞器和辅助装置的带压更换主控阀新技术,具有易观察、易受控、安全、可靠等优点,现场共应用9井次,具有显著的经济效益。 The master valves of the gas wells christmas tree exists the inner leakage, crooked screw rod, etc. problems. In order to eliminate potential safety hazard of master valves, a new technology which contains a special blanking plug and servicing unit has been researched to replace the master valves with pressure. It has some advantages, such as easy observation, controlled easily, operation safety and veraciousness. So far, this new technology has been applied to replace master valves of 9 gas wells and has obtained outstanding economic benefit.
出处 《钻采工艺》 CAS 北大核心 2007年第3期93-95,共3页 Drilling & Production Technology
关键词 带压更换 天然气井 采气树 主控制阀 堵塞器 replacing, gas well, christmas tree, master valve, blanking plug
  • 相关文献

同被引文献55

引证文献14

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部