期刊文献+

水电项目竣工环保验收报告编制技术要点研究 被引量:7

Study on Technical Points to Program the Report of the Check and Acceptance of the Environment Protection When Hydropower Projects Are Completed
下载PDF
导出
摘要 本文在水电项目生态环境影响调查,水、气、声环境质量调查和移民安置调查的基础上,重点分析施工期环保措施落实情况、竣工后环境恢复措施和项目建设前后周围环境质量变化情况,结合环境影响评价(EIA)和公众参与调查结论,确定水电项目竣工环保验收调查报告编制技术要点,为水电项目竣工环保验收调查报告编制的规范化、程序化提供一定的参考依据。 The paper based on the environmental impact investigation of hydropower projects, water, air and noise environmental quality investigation as well as relocates arrangement investigation concentrates on analyzing the fulfillment of environmental protection measures under construction and environmental resumption after operation. Linking with the EIA and the public involvement in the investigation and the change of the environmental quality before and after the construction, the paper fixes on the technical points used to program the investigation report on the check and acceptance of the environment protection by hydropower projects completion, and provides with a certain reference for the regularization and normalization of programming such a report.
作者 熊彦 张志华
出处 《中国水能及电气化》 2007年第4期10-12,共3页 China Water Power & Electrification
关键词 水电项目 环保验收报告 编制要点 Hydropower projects report of the check and acceptance of the environment protection programming points
  • 相关文献

参考文献2

二级参考文献13

共引文献33

同被引文献18

引证文献7

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部