摘要 分析了直线形、星形和圆环形3种常见水平接地极的特点,结合溪洛渡、向家坝直流换流站初选东阳和万寿极址的地形资料,对标准3圆环接地极的环径比例选择、各子圆环的埋深特性及采用该电极型式的可行性进行了分析研究。模拟计算表明:溪洛渡换流站接地极应优先考虑3圆环接地极型式,当其环径比例为0.7、布置型式采用同心非等深布置时,东阳极址在额定条件下可满足系统运行要求,且可获得较高的安全裕量;对于万寿极址,标准3圆环电极不能满足系统运行要求,如采用跑道式环形电极,则经济性很差,因此不宜作为换流站接地极址。 The features of three frequent types of level grounding poles, i.e., the linear type, star-like type and tomidal type, are analyzed. According to topographic information of Dongyang and Wanshou which are tentatively chosen as the sites to assemble grounding poles, the selection of d/D ratio, namely the ratio of radius of two adjacent toroids, of standard triple toroidal grounding poles, the burial depth characteristics of each sub-toroids and the feasibility of adopting such type of poles are researched. Simulation results show that for Xiluodu converter station the priority should be given to triple toroidal type of grounding poles, when the d/D ratio is equal to 0.7 and the arrangement of toroids are concentric and laid out with different depth, under rated conditions the pole site in Dongyang can meet the requirement of system operation and larger security margin can be obtained; for the pole site in Wanshou the standard triple toroidal grounding poles cannot meet the requirement of system operation, and the economic index would not be satisfied while the track-like toroidal grounding poles were adopted there, so Wanshou is not an appropriate site for grounding poles.
出处 《电网技术》 EI CSCD 北大核心 2007年第10期17-21,共5页 Power System Technology
关键词 特高压直流输电 直线电极 星型电极 圆环电极 埋深 绝缘 UHVDC linear electrode star-like electrode toroidal electrode burial depth insulation
  • 相关文献

参考文献16

  • 1吴桂芳.我国±500kV直流输电工程的电磁环境问题[J].电网技术,2005,29(11):5-8. 被引量:60
  • 2梁明.溪洛渡、向家坝水电站送出工程相关问题探讨[R].北京:国家电网公司,2005.
  • 3徐淑珍,朱子述.芦潮港-嵊泗直流工程预选极址的接地极计算和分析[J].上海交通大学学报,1999,33(12):1494-1496. 被引量:2
  • 4Wang Jianwu,Wen Xishan,Du Zhongdong,et al.Technical and economic performance analysis on vertical grounding electrodes of ±800 kV UHVDC[C].2006 China International Conference on Electricity Distribution,Beijing,China,2006.
  • 5国家电网公司.金沙江一期送电工程溪洛渡-浙西800 kV直流输电工程送端接地极及接地极线路报告[R].北京:国家电网公司.2005.
  • 6国家电网公司.金沙江一期送电工程溪洛渡至湖南输变电工程规划选站、选线阶段青口,株洲直流换流站接地极及接地极线路选址、选线报告[R].北京:国家电网公司,2005.
  • 7国家电网公司.金沙江一期送电工程向家坝-上海800 kV直流输电工程可行性研究向家坝送端接地极及接地极线路报告[R].北京:国家电网公司,2005.
  • 8Ruan W,Ma J,Liu J,et al.Performance of HVDC ground electrode in various soil structures[C].Proceedings of 2002 International Conference on Power System Technology,Kunming,2002,962-968.
  • 9Ma JX,Dawalibi R P,Ruan W.Design considerations of HVDC grounding electrodes[J].IEEE/PES Transmission and Distribution and Exhibition:Asia and Pacific,2005:1-6.
  • 10阮江军.直线型直流接地极附近三维电流场边界元法计算[J].高电压技术,1997,23(3):49-50. 被引量:9