摘要
干粉砂浆质量控制可从原材料选择、生产过程控制以及施工过程控制三个方面入手。只有合理选择原材料,恰当配比,对生产过程进行严格控制,在施工过程中严格按照施工工艺操作,才能保证粘结效果。
Key points of quality control for bonding mortar and coating mortar were raw materials,production process and construction process.Only these three points strictly controlled can best bonding effect be obtained.
出处
《墙材革新与建筑节能》
2007年第5期52-54,共3页
Construction Wall Innovation & Building Energy-Saving