摘要
驼峰自动化控制系统对铁路编组能力的提高有重要作用。分析了驼峰自动化控制系统在使用中暴露出的一些问题及采取的有效措施,指出了亟待解决的问题和改进方向。
The automatic control system of the hump plays a important role in enhancing the marshalling capability of the railway. Some questions of automatic control system of the hump discovered in application is introduced together with effective measurements be adopted to solve those problem in this paper. Meanwhile, the imperative questions to be addressed and the direction of improvement are brought forward.
出处
《铁道通信信号》
2007年第5期17-18,共2页
Railway Signalling & Communication
关键词
联合接地系统
系统程序
检修
United earthing system, System procedure, Examination and repair