摘要
XP项目开发周期依赖于项目团队的开发效率。这个效率可以用每个迭代开发阶段加入的用户Story被成功实现的概率来描述。提出了一种简单、实用的估计XP项目开发效率和迭代周期的数学方法。该方法可用于项目开发成本和工作量估计。用一组数据对该方法进行了模拟验证。
The development period of a Extreme Programming (X.P) project depends on the produetivity of development team. The productivity can be described by probability of which all user stories are achieved successfully in each iteration phase. In this paper, we presented a simple, but realistic mathematic method to estimate the productivity and iteration periods of XP project. The approach can be useful in estimation of development cost and effort. The approach was verified valid with a set of simulation data.
出处
《计算机应用》
CSCD
北大核心
2007年第5期1248-1250,共3页
journal of Computer Applications
基金
教育部春晖计划资助项目(S2005-2-52001)
关键词
极限编程
用户story
开发效率
迭代周期
extreme programming
user story
development productivity
iteration periods