一种XP项目迭代周期估计方法 被引量:1

An estimation method of iteration periods in XP project
下载PDF
导出
摘要 XP项目开发周期依赖于项目团队的开发效率。这个效率可以用每个迭代开发阶段加入的用户Story被成功实现的概率来描述。提出了一种简单、实用的估计XP项目开发效率和迭代周期的数学方法。该方法可用于项目开发成本和工作量估计。用一组数据对该方法进行了模拟验证。 The development period of a Extreme Programming (X.P) project depends on the produetivity of development team. The productivity can be described by probability of which all user stories are achieved successfully in each iteration phase. In this paper, we presented a simple, but realistic mathematic method to estimate the productivity and iteration periods of XP project. The approach can be useful in estimation of development cost and effort. The approach was verified valid with a set of simulation data.
作者 王晓华 赵明
出处 《计算机应用》 CSCD 北大核心 2007年第5期1248-1250,共3页 journal of Computer Applications
基金 教育部春晖计划资助项目(S2005-2-52001)
关键词 极限编程 用户story 开发效率 迭代周期 extreme programming user story development productivity iteration periods
  • 相关文献

参考文献7

  • 1MELIS M,TURNU I,CAU A,et al.Evaluating the impact of testfirst programming through software process simulation[J].Software Process:Improvement and Practice,2006,11 (4):345-360.
  • 2MATTHIAS MM,PADBERG F.On the economic evaluation of XP project[A].ESEC 9[C].2003.168-177.
  • 3SUCCI G,STEFANOVIC M,PEDRYCZ W.Quantitative assessment of extreme programming practices[J].Canadian Conference on Electrical and Computer Engineering,2001,1:13 -16.
  • 4MCGOVERN F.Managing software project with business-based requirement[J].IT Professional Publication Date,2002,4(5):18 -23.
  • 5BECK K,FOWLER M.Planning Extreme Programming[M].Addison-Wesley,2001.50 -52.
  • 6XIE M,ZHAO M.Modeling and estimation of MTBF in a Test-Analyse-And-Fix Environment[A].Reliability&Quality In Design -Prceedings of the ISSAT International Conference[C].1994.399 -401.
  • 7COHN M.User Stories Applied for Agile Software Development[M].Pearson,2004.73-84.

同被引文献6

  • 1沈雷,沈备军.敏捷方法的研究与实践[J].计算机工程,2005,31(7):219-222. 被引量:15
  • 2Arthur English. Extreme Programming: It' s Worth a Look [J]. IT Pro. 2002, May/June :48 - 50.
  • 3Mike Cohn. User Stories Applied for Agile Software Development[ M]. Pearson, 2004:73 - 84.
  • 4Kent Beck, Martin Fowler. Planning Extreme Programming[M]. Addison-Wesley,2001:50 - 52.
  • 5Fergal McGovern. Managing Software Project with Business-based Requirement [J]. IT Pro, 2002, September/ October: 18-23.
  • 6Amr Elssamadisy,Gregory Schalliol. Recognizing and responding to "Bad Smell "in Extreme Programming [J]. ICSE 02, May 19 - 25,2002, Orlando, Florida, USA: 617 - 622.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部