摘要 为解决轧制计划编制问题,研究了炼钢-连铸-热轧一体化生产批量计划,提出了基于约束满足的启发式算法。根据炼钢-连铸阶段批量计划约束条件,从轧制计划中提炼出炉次计划和浇次计划,同时提出启发式算法求解。在两个启发式算法的基础上,运用基于参数控制的策略,编制出前后工序协调一致的一体化批量计划。数据实验结果表明了该方法及算法的有效性。 The problem of integrated batch planning of steelmaking-continuous casting-hot roiling was studied. Firstly, a heuristic algorithm based on the constraint satisfaction was proposed to solve the problem. Secondly, another heuristic algorithm was presented to refine heat planning and cast planning from the hot-rolling batch planning. Based on these two heuristic algorithms, a parameter-control-based strategy was employed to obtain a better synchronization of batch planning of steel making, casting and roiling. Finally, an experiment with practical data showed that the method and algorithms were effective.
作者 孙玲 李铁克
出处 《计算机集成制造系统》 EI CSCD 北大核心 2007年第5期940-944,共5页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70371057)~~
关键词 炼钢-连铸-热轧 约束满足 生产批量计划 steel making-continuous casting-hot rolling constraint satisfaction batch planning
  • 相关文献

参考文献9

  • 1黄可为,卢克斌,汪定伟.炼钢组炉问题优化模型及其动态规划算法[J].东北大学学报(自然科学版),2006,27(2):138-141. 被引量:21
  • 2唐立新,杨自厚,王梦光.炼钢─连铸最优浇次(CAST)计划[J].东北大学学报(自然科学版),1996,17(5):554-558. 被引量:13
  • 3TANG L X,LIU J Y,RONG A Y,et al.A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Boahan iron and steel complex[J].European Journal of Operational Research,2000,124(2):267-282.
  • 4LOPEZ L,CARTER M W M,GENDREAU M.Hot strip mill production scheduling problem:a tabu search approach[J].European Journal of Operational Research,1998,106(2-3):317-335.
  • 5马天牧,张蕾,胡国奋,郑秉霖,柴天佑.冶铸轧一体化批量计划编制新技术[J].控制工程,2005,12(6):533-536. 被引量:8
  • 6唐立新.热轧调度并行处理策略的多旅行商模型[J].东北大学学报(自然科学版),1999,20(2):148-150. 被引量:24
  • 7SYRJANEN M.Production management as a constraint satisfaction problem[J].Journal of Intelligent Manufacturing,1998,9(6):515-522.
  • 8MICHEL G.Constraint programming and operations research:comments from an operations researcher[J].Journal of Heuristics,2002,8(1):19-24.
  • 9KOSIBA ED,WRIGHT JR.Discrete event sequencing as a traveling salesman problem[J].Computers in Industry,1992,19(3):317-327.

二级参考文献30

  • 1唐立新,杨自厚,王梦光.炼钢─连铸最优浇次(CAST)计划[J].东北大学学报(自然科学版),1996,17(5):554-558. 被引量:13
  • 2唐立新,杨自厚,王梦光.炼钢-连铸最优炉次计划模型与算法[J].东北大学学报(自然科学版),1996,17(4):440-445. 被引量:32
  • 3唐立新,杨自厚,王梦光,东北大学自动控制系.炼钢─连铸生产的计划与调度结构[J].东北大学学报(自然科学版),1996,17(6):664-667. 被引量:21
  • 4唐立析.CIMS下生产批量计划理论及其应用[M].北京:科学出版社,1999.115-129.
  • 5Harjunkoski I,Grossmann I E.A decomposition approach for the scheduling of a steel plant production[J].Computers and Chemical Engineering,2001,25(16):47-1660.
  • 6Craig I K,Camisani-Calzolari F R,Pistorius P C.A contemplative stance on the automation of continuous casting in steel processing[J].Control Engineering Practice,2001,9(9):1013-1020.
  • 7Smith A,Smith B.Constraint programming approaches to a scheduling problem in steelmaking[A].University of Leeds School of Computer Studies Research Report Series[C].Leeds:Leeds School Press,1997.1-10.
  • 8Tang L X,Liu J Y,Rong A Y,et al.A mathematical programming model for scheduling steelmaking-continuous casting production[J].European Journal of Operation Reseach,2000,120(2):423-435.
  • 9Pacciarelli D,Pranzo M.Production scheduling in a steelmaking-continuous casting plant[J].Computers and Chemical Engineer,2004,28(12):2823-2835.
  • 10Numao M,Morishita S.Cooperative scheduling and its application to steelmaking process[J].IEEE Tansactions on Industrial Electronics,1991,38(2):150-155.

共引文献58

同被引文献197

引证文献15

二级引证文献105

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部