用拉格朗日松弛法求解概率备用解析表达的机组组合 被引量:7

Unit commitment with analytic expression of probability reserve by the Lagrangian relaxation method
下载PDF
导出
摘要 由于电力系统运行中存在不确定性,因此在机组组合中有必要考虑机组投运风险水平的限制.但机组投运风险水平与机组强迫停运容量呈离散型的分布关系,因而难以与拉格朗日松弛法的机组组合算法有机结合.就这一问题,在前人研究的基础上,对系统投运风险曲线的两种拟合形式,即高斯函数和指数函数,进行分析和研究,发现前者精度较后者明显提高.在此基础上,将投运风险度约束以解析表达的方式引入机组组合的拉格朗日松弛法中,有机一体的完成了概率备用约束的机组组合问题,实现真正意义上的优化. of the existing uncertainty in power system operation, it is necessary to consider the risk of unit commitment. However, the relation between unit commitment risk and unit forced outage capacity is discrete, which leads to a difficult combination with the l.agrangian relaxation method of unit commitment. Two kinds of curve fitting forms of the unit commitment risk are analysed, which are the Gauss function fitting and exponential function fitting. The research shows the results of Gauss function fitting is more accurate than that of the exponential function fitting. By introducing the analytic expressed unit conmaitrnent risk constraints into the unit conmiitment Lagrangian relaxation method, the probability reserve constrained unit conmaitment problem can be achieved and optimized.
出处 《山东大学学报(工学版)》 CAS 2007年第2期58-62,108,共6页 Journal of Shandong University(Engineering Science)
基金 国家自然科学基金(50377021)
关键词 电力系统 机组组合 投运风险度 曲线拟合 拉格朗日法 power system unit commitment unit commitment risk curve fitting Lagrangian relaxation method
  • 相关文献

参考文献15

  • 1孟祥星,韩学山.不确定性因素引起备用的探讨[J].电网技术,2005,29(1):30-34. 被引量:59
  • 2PETERSON W L,BRAMMER S R.A capacity based lagrangian relaxation unit commitment with ramp rate constrains[J].IEEE Trans on Power Systems,1995,10(2):1077-1084.
  • 3HIRST E,KIRBY B.Operating reserves and bulk power reliability[J].Energy,1998,23(11):949-959.
  • 4韩学山,柳焯.考虑发电机组输出功率速度限制的最优机组组合[J].电网技术,1994,18(6):11-16. 被引量:88
  • 5王喆,余贻鑫,张弘鹏.社会演化算法在机组组合中的应用[J].中国电机工程学报,2004,24(4):12-17. 被引量:61
  • 6杨俊杰,周建中,喻菁,刘芳.一种求解大规模机组组合问题的混合智能遗传算法[J].电网技术,2004,28(19):47-50. 被引量:20
  • 7GOOI H B,MENDES D P,BELL K R W,et al.Optimal scheduling of spinning reserve[J].IEEE Trans on Power Systems,1999,14(4):1485-1490.
  • 8WU Hui,GOOI H B.Optimal scheduling of spinning reserve with ramp constraints[A].Proceedings of the 1999 Winter Meeting of IEEE Power Engineering Society.Part 2 (of 2)[C].New York:IEEE Press,1999.785-790.
  • 9TONG S K,SHAHIDEHPOUR S M.Hydrothermal unit commitment with probabilistic constraints using segmentation method[J].IEEE Transactions on Power Systems,1990,5(1):276-282.
  • 10CHATTOPADHYAY D,BALDICK R.Unit commitment with probabilistic reserve[A].2002 IEEE Power Engineering Society Winter Meeting[C].New York:Press,2002.280-285.

二级参考文献23

共引文献240

同被引文献197

引证文献7

二级引证文献110

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部