摘要
介绍了关河水库枢纽工程的概况,对3种取水口布置方案进行了比较,最终确定采用新建深井泵房取水方案。
This paper introduces the general situation of the junction engineering of the Guanhe Reservoir, compares the three layout plans of water intakes, and determines to adopt the water intake plan of using the newly-built deep well pumphouse.
出处
《科技情报开发与经济》
2007年第13期291-292,共2页
Sci-Tech Information Development & Economy
关键词
供水取水方案
枢纽工程
关河水库
plan of water supply and water intakes
junction engineering
Guanhe Reservoir