摘要
探讨了在区域供热锅炉房炉排减速机、风机、上煤机、出渣机的基础施工中遇到的问题及解决方法。
The problems and solutions in the foundational construction of grate gearbox, fan, coalfeeding machine and slag remover in district heating plant are discussed.
出处
《煤气与热力》
2007年第5期69-70,共2页
Gas & Heat
关键词
区域供热锅炉房
辅助设备
基础
district heating plant
auxiliary equipment
foundation