DEH单阀-顺序阀切换过程中机组负荷扰动大的分析 被引量:5

Analysis of Large Perturbation of Unit Load during the Course of Switch between Single Valve and Sequencing Valve
下载PDF
导出
摘要 南京化学园热电有限公司1、2号机为武汉汽轮机厂生产的CC60-8.83/4.3/1.5型单缸、双抽式汽轮机。1、2号汽轮机在单阀-顺序阀切换过程中机组负荷扰动较大,对机组的安全运行产生了不利影响。分析了机组负荷扰动大产生的原因,通过采用适当延长阀切换时间的办法消除了阀切换时机组负荷出现大幅的波动,为该类问题提供了解决思路。 The turbines equipped on unit No.1 and No.2 in Nanjing Chemical Garden Thermal Power Co. Ltd. are CC60- 8.83/4.3/1.5 single cylinder and double extraction turbine produced by Wuhan Steam Turbine plant. The load perturbation of both of the turbines is large during the course of switch between single valve and sequeneing valve, which had passive influence on the safe operation of units. The paper analyses the reasons for this phenomenon,thus the wide-range fluctuation of load can be avoided by means of properly prolonging the time of valve switch,which supplies a method of solving this problem.
作者 李维奇
出处 《江苏电机工程》 2007年第3期70-72,共3页 Jiangsu Electrical Engineering
关键词 DEH 单阀 顺序阀 负荷 DEH single valve sequencing valve load
  • 相关文献

同被引文献24

引证文献5

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部