电厂烟气治理工程中气力除灰系统异常分析及处理

Analysis and Disposal of Abnormal Problems in Pneumatic Ash Removal System in Power Plant Flue-gas Treatment Project
原文传递
导出
摘要 介绍了焦作电厂#2炉烟气治理半干法脱硫除尘工程中采用正压浓相助推式气力除灰系统的运行方式、设备配置、系统控制,对气力除灰系统运行调试中出现的主要异常问题进行分析,提出了相应的处理对策,可供今后相同类型气力除灰系统的优化、完善改造设计参考。 This paper expounds operating mode, equipment configuration and systems control of positive pressure dense phase thrust pneumatic ash removal system adopted in number 2 boiler flue-gas treatment semidry desulfuration and dedusting project of Jaozuo Power Plant,and analyses primary abnormal problem occurring in the debugging and operating courses of pneumatic ash removal system, and gives corresponding countermeasure, providing reference for optimization, perfection, rebuilding and design of the same type pneumatic ash removal system for the future.
作者 刘贯连 王兵
机构地区 河南焦作电厂
出处 《河南电力》 2007年第1期38-41,共4页 Henan Electric Power
关键词 脱硫除尘 气力除灰 异常问题处理 desulfuration and dedusting pneumatic ash removal abnormal problem disposal
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部