摘要
本文针对某电厂两台循环流化床锅炉调试中碰到的关键技术难题,其中涉及到锅炉膨胀节、给煤系统、一次风机系统、返料系统,进行了深入分析,并提出了一些解决方案,可为循环流化床锅炉的设计、施工、调试提供参考。
To the key technical problems of two CFB boilers on a power plant, relating to boiler expansion joint, feeding coal system, primary air fan system, back-feeder system, this paper supplies analyses and solution measures, which supply some references for design, construction, Communacating of CFB boiler.
出处
《河南电力》
2007年第1期42-44,共3页
Henan Electric Power
关键词
循环流化床锅炉
膨胀节
埋刮板给煤机
一次风机
共振
回料阀堵塞
CFB boiler
expansion joint
drag-link coal feeder
primary air fan
resonant vibration